Bidfident

Bidfident for tenant improvement contractors

Estimating software for tenant improvements

Tenant improvements are quick jobs with a lot of trades. In Bidfident you price metal stud partitions, ceiling grid, flooring and paint by the square foot, and doors, frames and hardware by the each, with carpenters, flooring installers and painters each at their own rate. Electrical and HVAC sub bids sit side by side, and bond and insurance go on a bid summary that adds up to the cent.

Get started

Enter your email and Bidfident sends you a sign-in link. New companies start with a starter rate library. Who runs Bidfident, and what it keeps about you.

Sound familiar?

  • A bond added at the last minute

    The landlord asks for a performance bond, and the markups get added by hand to a total that has since changed. In Bidfident contingency, fee, bond and insurance are worked out each time, with bond and insurance on the subtotal after fee.

  • After-hours work at the day rate

    The mall only allows noisy work at night, and the premium is a number someone remembers. In Bidfident a line can carry its own rate, marked in purple so anyone checking the bid sees it.

  • A rushed bid with a line at zero

    A five-week TI is priced in two days, and a door with no price slips through. In Bidfident lines to check flags any line that comes to $0, has no quantity or no cost code, or has hours or a material price more than 25% off the library's.

How Bidfident fits your work

  • Bidfident screenshot: each trade at its own rate

    Each trade at its own rate

    Partitions and ceilings by your carpenters, LVP by your flooring installers, paint by your painters, each at their rate from the library. A trade you haven't used yet can be added from the Trade cell.

  • Bidfident screenshot: night work at its own rate

    Night work at its own rate

    Give an after-hours line its own rate. It's marked in purple, so a rate that's meant to be different is easy to tell from a mistake.

  • Bidfident screenshot: bond and insurance where the lease asks for them

    Bond and insurance where the lease asks for them

    Contingency and fee, then bond and insurance on the subtotal after fee, with any sales tax shown apart. Every amount is rounded to the cent.

  • Bidfident screenshot: electrical and HVAC bids side by side

    Electrical and HVAC bids side by side

    Enter each sub bid for lighting and power, and for HVAC. The lowest is flagged and carried unless you pick another. No bids yet? Carry a plug number.

  • Bidfident screenshot: the feature wall as an alternate

    The feature wall as an alternate

    Price the slatted wood wall, then switch it off. It stays on the estimate, struck through, and what it comes to is shown beside the totals.

  • Bidfident screenshot: group by suite or floor

    Group by suite or floor

    Tag lines with the sales floor, the back of house or each suite, and group the sheet by area with a subtotal for each.

Worked example: a 3,000 SF retail tenant improvement

A made-up job, priced in Bidfident: 26 lines of your own work, 4 subs and 5 general conditions items over a 5-week job. The 6 lines this page talks about are listed one by one, and the rest are added up in one row. It's the same job you can open as an example project in Bidfident, so every figure below matches it.

To open this job in Bidfident: sign in and set up your company in the US, then on the Projects screen, under Example project, pick "Remodelers and home builders" and "Tenant improvements" and press Add example project.

Your own work
ItemAmount
Metal stud partitions, 3-5/8" studs, drywall both sides, 2,200 SF
  • Labor: 2,200 SF × 0.07 hrs = 154 hrs at $62.00/hr (carpenter) = $9,548.00
  • Material: 2,200 SF × $2.85 + 8% waste = $6,771.60
$16,319.60
Acoustic ceiling, 2 x 4 grid, 2,600 SF
  • Labor: 2,600 SF × 0.025 hrs = 65 hrs at $62.00/hr (carpenter) = $4,030.00
  • Material: 2,600 SF × $3.00 + 5% waste = $8,190.00
$12,220.00
Luxury vinyl plank, 2,700 SF
  • Labor: 2,700 SF × 0.02 hrs = 54 hrs at $52.00/hr (flooring installer) = $2,808.00
  • Material: 2,700 SF × $4.50 + 8% waste = $13,122.00
$15,930.00
Paint, primer and two coats, 6,800 SF
  • Labor: 6,800 SF × 0.008 hrs = 54.4 hrs at $52.00/hr (painter) = $2,828.80
  • Material: 6,800 SF × $0.20 + 5% waste = $1,428.00
$4,256.80
Doors, frames and hardware, 7 ea
  • Labor: 7 ea × 4 hrs = 28 hrs at $62.00/hr (finish carpenter) = $1,736.00
  • Material: 7 ea × $800.00 = $5,600.00
$7,336.00
Alternate 1: slatted wood feature wall, 240 SF
  • Labor: 240 SF × 0.25 hrs = 60 hrs at $62.00/hr (finish carpenter) = $3,720.00
  • Material: 240 SF × $26.00 = $6,240.00
  • Excluded: priced and kept on the estimate, but not in any total
$9,960.00
21 more lines of your own work
  • Labor $22,842.80 + material $15,598.38 + equipment $1,338.00
$39,779.18
Subcontractors
ItemAmount
Electrical and lighting
  • Bids: Bidder A $19,800.00, Bidder B $18,400.00
  • Carrying the lowest: Bidder B
$18,400.00
HVAC
  • Bids: Bidder A $13,100.00, Bidder B $13,700.00
  • Carrying the lowest: Bidder A
$13,100.00
Sprinkler relocation
  • Bids: Bidder A $5,480.00, Bidder B $5,760.00
  • Carrying the lowest: Bidder A
$5,480.00
Fire alarm devices, allowance
  • No bids yet: carrying a plug number
$3,000.00
General conditions
ItemAmount
Supervision, lead carpenter
  • 5 wk × $880.00, following the job duration
$4,400.00
Storefront barricade, rented
  • 5 wk × $145.00, following the job duration
$725.00
Building permit, tenant improvement
  • 1 LS × $1,900.00
$1,900.00
Dumpster swaps
  • 3 ea × $475.00
$1,425.00
Final clean
  • 1 LS × $760.00
$760.00
Bid summary
ItemAmount
Own work
  • Labor $43,793.60 + material $50,709.98 + equipment $1,338.00
$95,841.58
Excluded lines, not counted$9,960.00
Subcontractors$39,980.00
General conditions
  • 5 weeks
$9,210.00
Direct cost
  • Own work + subcontractors + general conditions
$145,031.58
Contingency
  • 5% of direct cost
$7,251.58
Fee
  • 12% of direct cost plus contingency
$18,273.98
Subtotal before the bond$170,557.14
Bond
  • 1% of the subtotal
$1,705.57
Insurance
  • 0.5% of the subtotal
$852.79
Bid total
  • The price you submit
$173,115.50

See it in Bidfident

A rate for one line After-hours work at its own rate, marked in purple so it's easy to spot. 31 sec
Lines to check Before a TI number goes out, Bidfident flags a door that comes to $0 or a ceiling line with no quantity. 32 sec
From cost to bid Direct cost, then contingency, fee, bond and insurance, rounded to the cent. 38 sec

Coming soon Ask your estimate anything. Claude first, ChatGPT to follow. See how it will work

Questions

Can I add bond and insurance to a TI bid?

Yes. Type the percentages on the bid summary. Bond and insurance are worked out on the subtotal after fee.

Can after-hours work be priced at a different rate?

Yes. Give the line its own rate. It's marked in purple so it stands out.

Can I add ceiling installers if they aren't in my library yet?

Yes. Type the new trade in the Trade cell and give it a rate. It's added to the library without leaving the sheet, ready for the grid and tile lines.

Will it catch a door I forgot to price?

If the line comes to $0, yes. Lines to check flags a line that comes to $0, hours with a $0 rate, no quantity or no cost code. A door with hours but no material price isn't flagged, since it still has a cost.

Can I show what each suite or floor comes to?

Yes. Tag each line with its suite, the sales floor or the back of house, and group the sheet by area. Each one gets its own subtotal.

Can I bring in a TI I already priced in Excel?

Not yet. Importing a whole estimate from Excel isn't built, but you can copy and paste your partition, ceiling and flooring lines into the sheet.

Does Bidfident work with Claude or ChatGPT?

Not yet, but it's coming. You'll be able to connect Bidfident to your own Claude or ChatGPT account and ask about your estimates in plain English. The answers will come from Bidfident's own figures, so they match the estimate. It will use the account you already have: Claude first, ChatGPT to follow.

Price your next tenant improvement bid in Bidfident

Get started

Enter your email and Bidfident sends you a sign-in link. New companies start with a starter rate library. Who runs Bidfident, and what it keeps about you.