Bidfident for directional boring contractors

Estimating software for directional boring

Boring contractors use Bidfident to price each bore by the linear foot: pilot and ream, HDPE pipe fused and pulled back, and drilling mud with its disposal. The HDD rig, fusion machine and vac truck each run for their own hours, not the crew's. Entry and exit pits go in by the each, crossing permits as a lump sum, and locates and restoration as subs.

Get started

Enter your email and Bidfident sends you a sign-in link. New companies start with a starter rate library. Who runs Bidfident, and what it keeps about you.

Sound familiar?

  • The rig billed for the crew's whole day

    Digging pits, setting up and fusing pipe keep the crew busy while the rig sits idle, but a spreadsheet row charges it the same hours. In Bidfident the rig, fusion machine and vac truck each get their own hours per unit.

  • A big rig rate magnifies a small slip

    At a rig rate of a few hundred an hour, a slip in its hours per foot moves the bid a long way. In Bidfident the bid total stays in view and shows how much it moved after each change, so a jump that size is hard to miss.

  • Permits and mud lost between rows

    Lump-sum permits and mud disposal sit in a corner of the sheet and get missed. In Bidfident permits go in as a lump-sum general conditions item, and mud is a line priced by the foot like the bore.

How Bidfident fits your work

  • Bidfident screenshot: the HDD rig for the hours it runs

    The HDD rig for the hours it runs

    Give the rig its own hours per foot, apart from the crew's. The fusion machine and vac truck can each have their own hours too.

  • Bidfident screenshot: bore lines that look off, flagged

    Bore lines that look off, flagged

    Before the bid goes out, Bidfident flags a bore or pit line with no cost code, no quantity, a total of zero, hours with a zero rate, or hours or a material price more than 25% off the library's.

  • Bidfident screenshot: locates and restoration bids compared

    Locates and restoration bids compared

    Enter each sub bid on the Subcontractors tab, see the lowest flagged, and carry it or the one you pick. No restoration bids yet? Carry a plug number.

  • Bidfident screenshot: permits as a lump sum, supervision by the week

    Permits as a lump sum, supervision by the week

    Crossing permits go in as a lump sum. Supervision runs by the week and follows the job duration, part weeks allowed.

  • Bidfident screenshot: rig, fusion and vac truck rates in one place

    Rig, fusion and vac truck rates in one place

    Your bore crew and every machine with its hourly rate, in one library that every estimate uses.

  • Bidfident screenshot: each crossing with its own subtotal

    Each crossing with its own subtotal

    Tag each bore with its crossing, the highway or a creek, and group the sheet to see what each one comes to.

Worked example: directional boring under a highway and two creeks

A made-up job, priced in Bidfident: 26 lines of your own work, 4 subs and 5 general conditions items over a 4-week job. The 4 lines this page talks about are listed one by one, and the rest are added up in one row. It's the same job you can open as an example project in Bidfident, so every figure below matches it.

To open this job in Bidfident: sign in and set up your company in the US, then on the Projects screen, under Example project, pick "Telecom and fiber" and "Directional boring" and press Add example project.

Your own work
ItemAmount
Directional bore, 6", pilot and ream, 790 LF
  • Labor: 790 LF × 0.09 hrs = 71.1 hrs at $62.00/hr (bore crew member) = $4,408.20
  • Equipment: hdd rig, 790 LF × 0.03 hrs = 23.7 hrs, less than the crew, at $230.00/hr = $5,451.00
$9,859.20
HDPE pipe, 4", fused and pulled back, 790 LF
  • Labor: 790 LF × 0.018 hrs = 14.22 hrs at $62.00/hr (bore crew member) = $881.64
  • Material: 790 LF × $5.20 + 3% waste = $4,231.24
  • Equipment: fusion machine, 790 LF × 0.006 hrs = 4.74 hrs, less than the crew, at $40.00/hr = $189.60
$5,302.48
Drilling mud and disposal, 790 LF
  • Material: 790 LF × $1.60 = $1,264.00
$1,264.00
Entry and exit pits, vacuum excavation, 2 ea
  • Labor: 2 ea × 6 hrs = 12 hrs at $62.00/hr (bore crew member) = $744.00
  • Equipment: vac truck, 2 ea × 4 hrs = 8 hrs, less than the crew, at $195.00/hr = $1,560.00
$2,304.00
22 more lines of your own work
  • Labor $22,920.09 + material $22,298.45 + equipment $18,236.51
  • 1 more line is priced but left out of the total
$63,455.05
Subcontractors
ItemAmount
Utility locates
  • Bids: Bidder A $1,900.00, Bidder B $1,700.00
  • Carrying the lowest: Bidder B
$1,700.00
Restoration, sod and asphalt
  • Bids: Bidder A $6,200.00, Bidder B $6,700.00
  • Carrying the lowest: Bidder A
$6,200.00
Traffic control, highway shoulder closure
  • Bids: Bidder A $5,480.00, Bidder B $5,760.00, Bidder C $5,120.00
  • Carrying the chosen bid: Bidder A
$5,480.00
Geotechnical review of bore profiles, allowance
  • No bids yet: carrying a plug number
$2,700.00
General conditions
ItemAmount
Supervision, foreman
  • 4 wk × $1,450.00, following the job duration
$5,800.00
Highway and creek crossing permits
  • 1 LS × $2,800.00
$2,800.00
Mobilize drill spread
  • 1 LS × $5,440.00
$5,440.00
Crew truck and tool trailer
  • 4 wk × $520.00, following the job duration
$2,080.00
Crew lodging and per diem, crew of four
  • 12 day × $560.00
$6,720.00
Bid summary
ItemAmount
Own work
  • Labor $28,953.93 + material $27,793.69 + equipment $25,437.11
$82,184.73
Excluded lines, not counted$968.43
Subcontractors$16,080.00
General conditions
  • 4 weeks
$22,840.00
Direct cost
  • Own work + subcontractors + general conditions
$121,104.73
Contingency
  • 5% of direct cost
$6,055.24
Fee
  • 10% of direct cost plus contingency
$12,716.00
Subtotal before the bond$139,875.97
Bond
  • 1% of the subtotal
$1,398.76
Insurance
  • 0.5% of the subtotal
$699.38
Bid total
  • The price you submit
$141,974.11

See it in Bidfident

Equipment that runs less than the crew The HDD rig and vac truck each get their own hours, so they're priced for the time they run. 30 sec
Why it's flagged Why a bore line is flagged: no cost code, no quantity, a zero total, or hours off the library. 37 sec
One library for every estimate Your bore crew, HDD rig, fusion machine and vac truck rates in one library every bid uses. 42 sec

Coming soon Ask your estimate anything. Claude first, ChatGPT to follow. See how it will work

Questions

My bore is priced by the foot but the rig works by the hour. How does that add up?

Each line takes the footage, the crew's hours per foot and the rig's own hours per foot. Bidfident works out the hours and prices both at their hourly rates.

Can one bore line carry both the bore crew and the HDD rig?

Yes. A line has a trade with its hours per unit and one piece of equipment by the hour, plus a material price, so the crew and the rig sit on the same bore line.

How do I price drilling mud and disposal?

Put it on its own line by the foot with a material price. A line with no trade or hours carries no labor.

Can I price permits as a lump sum?

Yes. General conditions items go on the General conditions tab, by the week, by the month, as a lump sum or each.

Does it read bore profiles from plans?

No. Type your footage in, or copy and paste it into the sheet.

What if my rig rate changes after I submit a bid?

A submitted bid keeps the labor and equipment rates it was priced with, so a later change to your library doesn't move a price you've already sent.

Does Bidfident work with Claude or ChatGPT?

Not yet, but it's coming. You'll be able to connect Bidfident to your own Claude or ChatGPT account and ask about your estimates in plain English. The answers will come from Bidfident's own figures, so they match the estimate. It will use the account you already have: Claude first, ChatGPT to follow.

Price your next boring bid in Bidfident

Get started

Enter your email and Bidfident sends you a sign-in link. New companies start with a starter rate library. Who runs Bidfident, and what it keeps about you.