Bidfident

Bidfident for demolition contractors

Estimating software for demolition

Strip-outs and building demolition come down to square metres, crew hours and machine time. In Bidfident you price ceilings, partitions and flooring by the m², give the excavator or floor grinder its own hours apart from the labourers, carry bins and haulage as a subtrade, and let the foreman's weeks follow the schedule. Bonding and insurance land on a bid summary that adds up to the cent.

Get started

Enter your email and Bidfident sends you a sign-in link. New companies start with a starter rate library. Who runs Bidfident, and what it keeps about you.

Sound familiar?

  • The excavator charged for every crew hour

    On an annex demolition the operator is there all day, but the shears only run part of it. A spreadsheet row usually charges the machine for every crew hour. In Bidfident the excavator gets its own hours per unit, so it's charged only for the time it runs.

  • Bin and haulage quotes on scraps of paper

    Three haulers, three prices, and the comparison is on a notepad by the phone. In Bidfident the disposal bids sit side by side, the lowest is flagged and carried, and you can pick another if you'd rather.

  • Thousands of square metres, one missed row

    Ceilings, partitions and flooring over several floors make a long sheet, and a sum that stops one row short goes unnoticed. In Bidfident the totals always include every line that's switched on, and lines to check flags anything with no quantity or a $0 rate.

How Bidfident fits your work

  • Bidfident screenshot: shears and grinders priced for their own hours

    Shears and grinders priced for their own hours

    Give the excavator with shears or the floor grinder its own hours per unit. It's charged for the hours it runs, while the labourers are charged for theirs.

  • Bidfident screenshot: labourers and operators at their own rates

    Labourers and operators at their own rates

    Set a rate for demolition labourers and another for equipment operators. Each line takes its trade's rate from your library, and a line with no trade uses the fallback rate.

  • Bidfident screenshot: bins and haulage compared

    Bins and haulage compared

    Enter each hauler's bid for bins, haulage and recycling. The lowest is flagged and carried unless you pick another, and declined bids are ignored.

  • Bidfident screenshot: each floor and the annex with its own subtotal

    Each floor and the annex with its own subtotal

    Tag lines with a floor, a wing or the annex, group the sheet by it, and collapse the groups to see the whole job on one screen.

  • Bidfident screenshot: foreman and hoarding on the overhead list

    Foreman and hoarding on the overhead list

    Put the foreman in by the week and dust control and hoarding as a lump sum. Change the job from 7 weeks to 8 and the weekly items follow.

  • Bidfident screenshot: contingency for what's behind the walls

    Contingency for what's behind the walls

    Carry a contingency for what turns up behind walls and ceilings, then fee, bonding and insurance on the subtotal after fee. GST is shown separately for reference, and the bid total is before tax.

Worked example: interior strip-out and annex demolition at an office building

A made-up job, priced in Bidfident: 28 lines of your own work, 4 subtrades and 6 overhead items over a 7-week job. The 4 lines this page talks about are listed one by one, and the rest are added up in one row. It's the same job you can open as an example project in Bidfident, so every figure below matches it.

To open this job in Bidfident: sign in and set up your company in Canada, then on the Projects screen, under Example project, pick "Demolition and abatement" and "Demolition" and press Add example project.

Your own work
ItemAmount
Remove ceilings, grid and tile, 3,600 m2
  • Labour: 3,600 m2 × 0.06 hrs = 216 hrs at $62.00/hr (demolition labourer) = $13,392.00
$13,392.00
Remove partitions, steel stud and board, 2,200 m2
  • Labour: 2,200 m2 × 0.09 hrs = 198 hrs at $62.00/hr (demolition labourer) = $12,276.00
$12,276.00
Remove flooring and grind adhesive, 3,600 m2
  • Labour: 3,600 m2 × 0.05 hrs = 180 hrs at $62.00/hr (demolition labourer) = $11,160.00
  • Equipment: floor grinder, 3,600 m2 × 0.02 hrs = 72 hrs, less than the crew, at $35.00/hr = $2,520.00
$13,680.00
Demolish single-storey annex, 650 m2
  • Labour: 650 m2 × 0.3 hrs = 195 hrs at $92.00/hr (heavy equipment operator) = $17,940.00
  • Equipment: excavator with shears, 650 m2 × 0.12 hrs = 78 hrs, less than the crew, at $195.00/hr = $15,210.00
$33,150.00
24 more lines of your own work
  • Labour $84,007.40 + material $23,513.50 + equipment $14,313.75
  • 1 more line is priced but left out of the total
$121,834.65
Subtrades
ItemAmount
Disposal and recycling, bins and haulage
  • Bids: Bidder A $38,500.00, Bidder B $34,900.00, Bidder C $36,200.00
  • Carrying the lowest: Bidder B
$34,900.00
Electrical make-safe and temporary lighting
  • Bids: Bidder A $8,600.00, Bidder B $9,200.00
  • Carrying the lowest: Bidder A
$8,600.00
Saw-cutting at annex junction
  • Bids: Bidder A $4,200.00, Bidder B $3,900.00
  • Carrying the picked bid: Bidder A
$4,200.00
Unforeseen buried footings, allowance
  • No bids yet: carrying the plug amount
$6,000.00
Overhead
ItemAmount
Site supervision, foreman
  • 7 wk × $1,800.00, following the job duration
$12,600.00
Dust control and hoarding
  • 1 LS × $6,400.00
$6,400.00
Project manager, part time
  • 7 weeks × $2,600.00 a month × 12 ÷ 52, following the job duration
$4,200.00
Small tools, saws and consumables
  • 7 wk × $220.00, following the job duration
$1,540.00
Demolition permit and notices
  • 1 LS × $1,500.00
$1,500.00
Mobilization and demobilization
  • 1 LS × $3,800.00
$3,800.00
Bid summary
ItemAmount
Own work
  • Labour $138,775.40 + material $23,513.50 + equipment $32,043.75
$194,332.65
Excluded lines, not counted$2,790.00
Subtrades$53,700.00
Overhead
  • 7 weeks
$30,040.00
Direct cost
  • Own work + subtrades + overhead
$278,072.65
Contingency
  • 7% of direct cost
$19,465.09
Fee
  • 12% of direct cost plus contingency
$35,704.53
Subtotal before bonding$333,242.27
Bonding
  • 1.5% of the subtotal
$4,998.63
Insurance
  • 1% of the subtotal
$3,332.42
Bid total
  • The price you submit, before GST
$341,573.32
GST, for reference
  • 5%, shown separately and not part of the bid total
$17,078.67

See it in Bidfident

Equipment that runs less than the crew The excavator runs for its own hours per square metre, not for every hour the crew is on site. 30 sec
Bids side by side Bin and haulage bids side by side, with the lowest flagged and carried unless you pick another. 42 sec
Group by area or floor Group the strip-out by floor or area to see what each part of the building costs. 34 sec

Coming soon Ask your estimate anything. Claude first, ChatGPT to follow. See how it will work

Questions

Can the excavator run fewer hours than the crew?

Yes. Give the line's equipment its own hours per unit. Leave it blank and the machine runs for the crew's hours.

Can I price the strip-out floor by floor?

Yes. Tag each line with an area or location, such as a floor or the annex, and group the sheet by it with subtotals.

Can I price taking down the annex as an option?

Yes. Switch the line off as an alternate. It stays on the sheet struck through, and what it comes to is shown beside the totals, but it isn't in the bid.

Does it read areas off the drawings?

No. Bidfident doesn't read quantities from drawings or plans. You type or paste the square metres into the sheet yourself.

Can I carry bins and haulage before the haulers quote?

Yes. Carry a plug amount for the disposal subtrade, then enter each hauler's bid as it comes in and carry the lowest or the one you pick.

Can labourers and equipment operators have different rates?

Yes. Set a rate for each trade in your library and each line takes its trade's rate. A line can also carry its own rate, marked in purple, for night work or a premium.

Does Bidfident work with Claude or ChatGPT?

Not yet, but it's coming. You'll be able to connect Bidfident to your own Claude or ChatGPT account and ask about your estimates in plain English. The answers will come from Bidfident's own figures, so they match the estimate. It will use the account you already have: Claude first, ChatGPT to follow.

Price your next demolition bid in Bidfident

Get started

Enter your email and Bidfident sends you a sign-in link. New companies start with a starter rate library. Who runs Bidfident, and what it keeps about you.