Bidfident

Bidfident for remediation contractors

Estimating software for site remediation

Remediation estimates turn on cubic metres of soil. In Bidfident you price contaminated soil excavation and clean backfill by the m³, give the excavator and roller compactor their own hours, and add tank removals by the ea and water treatment as a lump sum. Soil haulage and confirmatory testing go in as subtrades, and the superintendent and environmental monitoring follow the schedule by the week.

Get started

Enter your email and Bidfident sends you a sign-in link. New companies start with a starter rate library. Who runs Bidfident, and what it keeps about you.

Sound familiar?

  • Soil haulage is the biggest number, and the hardest to compare

    Haulage and disposal of contaminated soil can be most of the job, and the quotes arrive in different shapes. In Bidfident each bid sits side by side, the lowest is flagged and carried, and you can carry a plug amount until the quotes are in.

  • Backfill without the extra

    Clean granular fill always takes more than the hole, and spreadsheets bury the allowance in a formula nobody checks. In Bidfident each line's material has a waste percentage in plain view, so the extra 10% is there for anyone to see.

  • Monitoring that outlasts the estimate

    The dig runs a week longer than planned, but the environmental monitoring line still shows the old number of weeks. In Bidfident weekly items linked to the job duration follow it, part weeks included.

How Bidfident fits your work

  • Bidfident screenshot: soil haulage and testing side by side

    Soil haulage and testing side by side

    Enter each bid for contaminated soil haulage and disposal, and for confirmatory testing. The lowest is flagged and carried unless you pick another.

  • Bidfident screenshot: excavator and compactor at their own hours

    Excavator and compactor at their own hours

    Give the excavator its own hours per m³ dug, and the roller compactor its own hours per m³ placed. Each is charged for the hours it runs.

  • Bidfident screenshot: superintendent and monitoring by the week

    Superintendent and monitoring by the week

    Link the site superintendent and environmental monitoring to the job duration. Stretch the job from 5 weeks to 5.5 and both follow.

  • Bidfident screenshot: extra excavation kept as an option

    Extra excavation kept as an option

    Price a possible extra dig or a third tank as an alternate. It stays on the sheet struck through, with its amount shown beside the totals, and isn't counted in the bid.

  • Bidfident screenshot: the bid in view as volumes change

    The bid in view as volumes change

    Change the cubic metres of soil and the bid total at the top shows how much it moved, straight away.

  • Bidfident screenshot: earlier versions of the estimate kept

    Earlier versions of the estimate kept

    Volumes change as testing comes back. Compare any saved version with now, and restore an earlier one with a click.

Worked example: clean-up of a former service station site

A made-up job, priced in Bidfident: 24 lines of your own work, 4 subtrades and 6 overhead items over a 5-week job. The 4 lines this page talks about are listed one by one, and the rest are added up in one row. It's the same job you can open as an example project in Bidfident, so every figure below matches it.

To open this job in Bidfident: sign in and set up your company in Canada, then on the Projects screen, under Example project, pick "Demolition and abatement" and "Site remediation" and press Add example project.

Your own work
ItemAmount
Excavate contaminated soil and load, 1,800 m3
  • Labour: 1,800 m3 × 0.06 hrs = 108 hrs at $92.00/hr (heavy equipment operator) = $9,936.00
  • Equipment: excavator, 30 t, 1,800 m3 × 0.03 hrs = 54 hrs, less than the crew, at $165.00/hr = $8,910.00
$18,846.00
Water treatment for the excavation, 1 LS
  • Labour: 1 LS × 60 hrs = 60 hrs at $62.00/hr (remediation labourer) = $3,720.00
  • Material: 1 LS × $7,500.00 = $7,500.00
$11,220.00
Remove underground fuel tanks, 25,000 L, 2 ea
  • Labour: 2 ea × 24 hrs = 48 hrs at $92.00/hr (heavy equipment operator) = $4,416.00
  • Material: 2 ea × $1,800.00 = $3,600.00
  • Equipment: excavator, 30 t, 2 ea × 8 hrs = 16 hrs, less than the crew, at $165.00/hr = $2,640.00
$10,656.00
Clean granular backfill, compacted, 1,800 m3
  • Labour: 1,800 m3 × 0.05 hrs = 90 hrs at $62.00/hr (remediation labourer) = $5,580.00
  • Material: 1,800 m3 × $26.00 + 10% waste = $51,480.00
  • Equipment: roller compactor, 1,800 m3 × 0.02 hrs = 36 hrs, less than the crew, at $55.00/hr = $1,980.00
$59,040.00
20 more lines of your own work
  • Labour $32,630.20 + material $36,128.00 + equipment $17,311.75
  • 2 more lines are priced but left out of the total
$86,069.95
Subtrades
ItemAmount
Contaminated soil haulage and disposal
  • Bids: Bidder A $142,000.00, Bidder B $128,500.00, Bidder C $136,000.00
  • Carrying the lowest: Bidder B
$128,500.00
Confirmatory soil testing
  • Bids: Bidder A $9,400.00, Bidder B $8,600.00
  • Carrying the lowest: Bidder B
$8,600.00
Asphalt paving reinstatement
  • Bids: Bidder A $38,500.00, Bidder B $41,200.00
  • Carrying the lowest: Bidder A
$38,500.00
Free product and contaminated water disposal, allowance
  • No bids yet: carrying the plug amount
$6,500.00
Overhead
ItemAmount
Site superintendent
  • 5 wk × $2,900.00, following the job duration
$14,500.00
Environmental monitoring
  • 5 wk × $1,900.00, following the job duration
$9,500.00
Project manager, part time
  • 5 weeks × $2,600.00 a month × 12 ÷ 52, following the job duration
$3,000.00
Site trailer and washroom
  • 5 wk × $320.00, following the job duration
$1,600.00
Environmental permits and notices
  • 1 LS × $1,200.00
$1,200.00
Mobilization and demobilization
  • 1 LS × $6,500.00
$6,500.00
Bid summary
ItemAmount
Own work
  • Labour $56,282.20 + material $98,708.00 + equipment $30,841.75
$185,831.95
Excluded lines, not counted$8,234.00
Subtrades$182,100.00
Overhead
  • 5 weeks
$36,300.00
Direct cost
  • Own work + subtrades + overhead
$404,231.95
Contingency
  • 6% of direct cost
$24,253.92
Fee
  • 10% of direct cost plus contingency
$42,848.59
Subtotal before bonding$471,334.46
Bonding
  • 1.5% of the subtotal
$7,070.02
Insurance
  • 1.5% of the subtotal
$7,070.02
Bid total
  • The price you submit, before GST
$485,474.50
GST, for reference
  • 5%, shown separately and not part of the bid total
$24,273.73

See it in Bidfident

Bids side by side Soil haulage bids side by side. The lowest is carried unless you pick another, and a plug fills the gap. 42 sec
The bid, always in view Change the cubic metres of soil and see at once how much the bid moved. 36 sec
Version history Compare the estimate with an earlier version as volumes change, and restore it with a click. 35 sec

Coming soon Ask your estimate anything. Claude first, ChatGPT to follow. See how it will work

Questions

Can I price soil by the tonne as well as the cubic metre?

You can use either unit on a line, since units are free text. Bidfident doesn't convert between them, so price each line in the unit its rate is in.

Can I carry soil haulage before the quotes are in?

Yes. Carry a plug amount for the subtrade, then enter the bids as they come in and carry the lowest or the one you pick.

Can each machine have its own hours?

Yes. Each line's equipment can have its own hours per unit. Leave it blank and it runs for the crew's hours.

Can I add a waste allowance to backfill?

Yes. Each line's material has a waste percentage, and the total includes it.

Can water treatment go in as a lump sum?

Yes. Use LS as the unit with a quantity of 1, and put the hours and materials for the treatment system on that line.

Does it read quantities from site plans or maps?

No. You enter the volumes yourself, from your own measurements or the consultant's report.

Does Bidfident work with Claude or ChatGPT?

Not yet, but it's coming. You'll be able to connect Bidfident to your own Claude or ChatGPT account and ask about your estimates in plain English. The answers will come from Bidfident's own figures, so they match the estimate. It will use the account you already have: Claude first, ChatGPT to follow.

Price your next remediation bid in Bidfident

Get started

Enter your email and Bidfident sends you a sign-in link. New companies start with a starter rate library. Who runs Bidfident, and what it keeps about you.