Bidfident for underground utility contractors

Estimating software for underground utilities

For water, sewer and storm work, Bidfident prices pipe by the linear foot, trenching and bedding by the cubic yard, and manholes each. Pipelayers, operators and laborers each carry their own rate, the excavator gets its own hours on every line, sewer TV inspection comes in as a sub bid, and the trench box and super follow the schedule week by week.

Get started

Enter your email and Bidfident sends you a sign-in link. New companies start with a starter rate library. Who runs Bidfident, and what it keeps about you.

Sound familiar?

  • One excavator, very different hours

    Digging trench takes the excavator minutes per cubic yard, setting a manhole takes hours. A spreadsheet with one machine rate gets both wrong. In Bidfident each line gives the excavator its own hours per unit.

  • Pipelayers at a blended rate

    Pipelayers, operators and laborers end up at one average rate, and the number drifts as the crew mix changes. In Bidfident each line takes its trade's rate from the library, and any line can carry its own rate, marked in purple.

  • Trench box rental stuck at the old schedule

    The job grows from 7 weeks to 9, and the trench box and super stay where they were. In Bidfident weekly items linked to the job duration follow it.

How Bidfident fits your work

  • Bidfident screenshot: pipe by the linear foot, manholes each

    Pipe by the linear foot, manholes each

    Sanitary sewer and water main by the LF, trench and bedding by the CY, manholes each. Each line has crew hours per unit and a material price with a waste percentage.

  • Bidfident screenshot: excavator hours line by line

    Excavator hours line by line

    The excavator can run 0.03 hours per cubic yard on trenching and 3 hours on each manhole. Each line charges it for its own hours, not the crew's.

  • Bidfident screenshot: pipelayers, operators and laborers

    Pipelayers, operators and laborers

    Set a rate for each trade once in the library. Every line takes its trade's rate, so a pipe line and a bedding line are each priced right.

  • Bidfident screenshot: trench box by the week

    Trench box by the week

    Rent the trench box and pay the super by the week, linked to the job duration. Change the weeks and both follow.

  • Bidfident screenshot: tV inspection and testing bids

    TV inspection and testing bids

    Enter each bid for sewer TV inspection or pressure testing, see the lowest flagged, and carry it or the one you pick. Carry a plug number until bids arrive.

  • Bidfident screenshot: group by street or phase

    Group by street or phase

    Tag lines with an area or location, like a street or a phase of the subdivision, and group the sheet with a subtotal for each.

Worked example: water and sewer for a 24-lot subdivision phase

A made-up job, priced in Bidfident: 28 lines of your own work, 4 subs and 5 general conditions items over a 7-week job. The 5 lines this page talks about are listed one by one, and the rest are added up in one row. It's the same job you can open as an example project in Bidfident, so every figure below matches it.

To open this job in Bidfident: sign in and set up your company in the US, then on the Projects screen, under Example project, pick "Sitework and civil" and "Underground utilities" and press Add example project.

Your own work
ItemAmount
Trench excavation and backfill, 1,570 CY
  • Labor: 1,570 CY × 0.07 hrs = 109.9 hrs at $68.00/hr (equipment operator) = $7,473.20
  • Equipment: excavator, 45,000 lb, 1,570 CY × 0.03 hrs = 47.1 hrs, less than the crew, at $150.00/hr = $7,065.00
$14,538.20
8" PVC sanitary sewer, SDR 35, 1,180 LF
  • Labor: 1,180 LF × 0.11 hrs = 129.8 hrs at $58.00/hr (pipelayer) = $7,528.40
  • Material: 1,180 LF × $9.50 + 3% waste = $11,546.30
$19,074.70
6" PVC water main, C900, 1,115 LF
  • Labor: 1,115 LF × 0.09 hrs = 100.35 hrs at $58.00/hr (pipelayer) = $5,820.30
  • Material: 1,115 LF × $11.50 + 3% waste = $13,207.18
$19,027.48
48" precast manholes, 5 ea
  • Labor: 5 ea × 10 hrs = 50 hrs at $58.00/hr (pipelayer) = $2,900.00
  • Material: 5 ea × $3,600.00 = $18,000.00
  • Equipment: excavator, 45,000 lb, 5 ea × 3 hrs = 15 hrs, less than the crew, at $150.00/hr = $2,250.00
$23,150.00
Pipe bedding, 3/4" crushed stone, 355 CY
  • Labor: 355 CY × 0.08 hrs = 28.4 hrs at $45.00/hr (laborer) = $1,278.00
  • Material: 355 CY × $55.00 + 10% waste = $21,477.50
$22,755.50
23 more lines of your own work
  • Labor $53,059.22 + material $135,632.68 + equipment $26,669.25
  • 1 more line is priced but left out of the total
$215,361.15
Subcontractors
ItemAmount
Sewer TV inspection
  • Bids: Bidder A $4,300.00, Bidder B $3,950.00
  • Carrying the lowest: Bidder B
$3,950.00
Asphalt patching at tie-ins
  • Bids: Bidder A $6,240.00, Bidder B $6,720.00, Bidder C $5,760.00
  • Carrying the chosen bid: Bidder A
$6,240.00
Staking and as-built survey
  • Bids: Bidder A $5,520.00, Bidder B $5,920.00
  • Carrying the lowest: Bidder A
$5,520.00
Rock and boulder removal, allowance
  • No bids yet: carrying a plug number
$7,200.00
General conditions
ItemAmount
Superintendent
  • 7 wk × $2,500.00, following the job duration
$17,500.00
Trench box rental
  • 7 wk × $700.00, following the job duration
$4,900.00
Mobilize excavator, backhoe and trench box
  • 1 LS × $6,000.00
$6,000.00
Traffic control at the tie-ins
  • 6 day × $950.00
$5,700.00
Job trailer
  • 7 wk × $220.00, following the job duration
$1,540.00
Bid summary
ItemAmount
Own work
  • Labor $78,059.12 + material $199,863.66 + equipment $35,984.25
$313,907.03
Excluded lines, not counted$7,286.53
Subcontractors$22,910.00
General conditions
  • 7 weeks
$35,640.00
Direct cost
  • Own work + subcontractors + general conditions
$372,457.03
Contingency
  • 4% of direct cost
$14,898.28
Fee
  • 10% of direct cost plus contingency
$38,735.53
Subtotal before the bond$426,090.84
Bond
  • 1% of the subtotal
$4,260.91
Insurance
  • 0.5% of the subtotal
$2,130.45
Bid total
  • The price you submit
$432,482.20

See it in Bidfident

Labour by trade Pipelayers, operators and laborers each take their own rate from the library, line by line. 33 sec
Site costs that follow the schedule The trench box and super by the week follow the job duration as it changes. 38 sec
Group by area or floor Water and sewer work grouped by street, with a subtotal for each. 34 sec

Coming soon Ask your estimate anything. Claude first, ChatGPT to follow. See how it will work

Questions

Can I price pipe by the linear foot and manholes each?

Yes. Units are free text, so LF, CY and EA work side by side. Bidfident doesn't convert between units.

Can a manhole line use more excavator time than a trench line?

Yes. Every line gives the excavator its own hours per unit, so each one is charged for the time it needs.

Can pipelayers have a different rate from operators?

Yes. Set a rate for each trade in the library. Any single line can also carry its own rate.

Can the trench box follow the schedule?

Yes. Add it by the week and link it to the job duration, and it updates when the duration changes.

Can I split the job by street or phase?

Yes. Tag lines with an area or location and group the sheet by it, with subtotals. The cost report can filter by them too.

Can it track pipe laid against the estimate?

No. Bidfident is for pricing the job. It doesn't do job costing against actuals or time tracking.

Does Bidfident work with Claude or ChatGPT?

Not yet, but it's coming. You'll be able to connect Bidfident to your own Claude or ChatGPT account and ask about your estimates in plain English. The answers will come from Bidfident's own figures, so they match the estimate. It will use the account you already have: Claude first, ChatGPT to follow.