Free estimating spreadsheet
Free construction estimate templates for Excel
An estimating spreadsheet for each kind of work, set up for the UK: pounds, VAT and metric units. Each one comes as a worked example you can change, and as a blank copy to start your own. No sign-up, no email.
Filled one in already? Import lines in Bidfident brings in the lines from its Estimate tab.
What's in each spreadsheet
Rates
Your hourly rates for each trade and each item of plant, the job length in weeks, and your percentages: contingency, overheads and profit, bond, insurance and VAT.
Estimate
One row for each line of work: its cost code, quantity, hours per unit and materials cost, with a starter list of cost codes to pick from or change. Mark a line Excluded to price an option without counting it.
Subcontractors and preliminaries
The quotes you have for each package, with the lowest carried unless you pick another, and your running costs for the job.
Tender summary and quotation
Your tender total, worked out in order with nothing to type, and a one-page quotation for your customer, with the total filled in from it.
Yellow cells are yours to type in. Grey cells are worked out for you, and locked so a formula can't be typed over by accident. Each worked example gives the same totals, to the penny, as the same job in Bidfident. Version 0.1, October 2026.
The example has a whole job filled in, ready to change into your own. The blank one starts empty.
Specialist subcontractors
Electrical
Worked example: Electrical installation for a two-storey office fit-out £143,468.12
Download the example spreadsheet Download a blank spreadsheet
Plumbing and mechanical
Worked example: Plumbing for a nursery refurbishment £74,403.97
Download the example spreadsheet Download a blank spreadsheet
HVAC and ductwork
Worked example: Ventilation and air conditioning for a single-storey health centre £150,790.20
Download the example spreadsheet Download a blank spreadsheet
Dry lining
Worked example: Dry lining and ceilings for a three-storey office £292,758.72
Download the example spreadsheet Download a blank spreadsheet
Roofing
Worked example: Replacing a flat warehouse roof £210,038.47
Download the example spreadsheet Download a blank spreadsheet
Painting and decorating
Worked example: Decorating the communal areas of a block of 40 flats £68,830.76
Download the example spreadsheet Download a blank spreadsheet
Flooring
Worked example: Floor finishes for a two-storey dental practice £71,935.60
Download the example spreadsheet Download a blank spreadsheet
Brickwork and blockwork
Worked example: Facing brickwork for a three-storey care home £332,887.56
Download the example spreadsheet Download a blank spreadsheet
Concrete
Worked example: Ground-bearing slab for a warehouse extension £216,835.65
Download the example spreadsheet Download a blank spreadsheet
Civils and groundworks
Excavation
Worked example: Excavation for a two-storey commercial building £244,235.18
Download the example spreadsheet Download a blank spreadsheet
Earthworks
Worked example: Earthworks and levels for a school playing field £153,188.59
Download the example spreadsheet Download a blank spreadsheet
Surfacing
Worked example: Surfacing for a 120-space car park £290,449.87
Download the example spreadsheet Download a blank spreadsheet
Drainage and utilities
Worked example: Drainage and water mains for a 24-plot housing phase £250,654.67
Download the example spreadsheet Download a blank spreadsheet
Hard and soft landscaping
Worked example: Hard and soft landscaping for a townhouse development £215,659.89
Download the example spreadsheet Download a blank spreadsheet
Refurbishment and housebuilders
Refurbishments
Worked example: Kitchen and ground floor refurbishment in a 1960s bungalow £67,631.18
Download the example spreadsheet Download a blank spreadsheet
Extensions
Worked example: A two-storey rear extension, built to weathertight £115,022.93
Download the example spreadsheet Download a blank spreadsheet
New builds
Worked example: A 223 m² one-off new build £368,854.80
Download the example spreadsheet Download a blank spreadsheet
Fit-outs
Worked example: A 280 m² retail fit-out £111,482.63
Download the example spreadsheet Download a blank spreadsheet
Demolition and asbestos removal
Demolition and soft strip
Worked example: Soft strip and annex demolition at an office building £160,547.76
Download the example spreadsheet Download a blank spreadsheet
Asbestos removal
Worked example: Licensed asbestos removal of pipe lagging and floor tiles at a school £154,587.29
Download the example spreadsheet Download a blank spreadsheet
Hazardous materials
Worked example: Lead paint, PCB capacitors and mould at an empty warehouse £93,629.43
Download the example spreadsheet Download a blank spreadsheet
Land remediation
Worked example: Remediation of a former petrol station site £431,034.72
Download the example spreadsheet Download a blank spreadsheet
Shutdowns and turnarounds
Plant shutdowns
Worked example: A two-week shutdown at a food factory £223,283.01
Download the example spreadsheet Download a blank spreadsheet
Turnarounds
Worked example: A three-week turnaround on a process unit £429,020.73
Download the example spreadsheet Download a blank spreadsheet
Mechanical installation
Worked example: Installing a new packing line £163,174.66
Download the example spreadsheet Download a blank spreadsheet
Planned maintenance
Worked example: Annual boiler and pump maintenance at a hospital £62,728.31
Download the example spreadsheet Download a blank spreadsheet
Telecoms and fibre
Fibre cabling
Worked example: Fibre to a rural business park £90,845.01
Download the example spreadsheet Download a blank spreadsheet
Duct runs
Worked example: Ducting for a 3 km fibre route £115,117.32
Download the example spreadsheet Download a blank spreadsheet
Directional drilling
Worked example: Directional drilling under a trunk road and two watercourses £85,244.87
Download the example spreadsheet Download a blank spreadsheet
Fibre jointing
Worked example: Jointing for a 288-fibre ring £43,647.12
Download the example spreadsheet Download a blank spreadsheet
Street cabinets
Worked example: Installing six fibre street cabinets £104,817.94
Download the example spreadsheet Download a blank spreadsheet
Fair use
Free for your own tenders. Check every figure before you send a tender. Please don't resell it.
When your spreadsheet gets heavy
If you end up with lots of tenders, changing rates or more than one person working on them, Bidfident does the same sums on a page and keeps every tender with its saved versions.